Meet the all-new Project Office (version 3.1)

Meet the all-new Project Office (version 3.1)

An app is completely rebuilt, with new features and a beautiful new design.

Project Office is completely rebuilt, with new features and a beautiful new design for efficient project planning using Gantt charts. Project Office now supports both system Dark and Light Modes on macOS Mojave. Project Office is bringing the most frequently used tools and controls within finger reach.

Here’s what’s new inversion 3.1:


• BRAND-NEW DESIGN

Project Office has been completely redesigned all the app elements.


• DARK AND LIGHT MODES

Project Office now supports both system Dark and Light Modes on macOS Mojave. When your Mac’s Appearance is set to Dark in System Preferences, an app interface will automatically switch to Dark Mode.


• TOUCH BAR SUPPORT

Project Office is bringing the most frequently used tools and controls within finger reach. You can customize the Touch Bar with useful tools and controls to your fingertips and gain an instant access to your typical toolbar buttons without leaving the keyboard.


• TIME UNITS SETTINGS

In the new version of Project Office you can set time units (hours, days, or whatever works best for you) to display durations and amounts of effort.


• SMART DATE PARSING

Time units are designated with abbreviations defined for each localization. Entering duration or effort as “1 S” in French now results in 1 week instead of 1 second.


• ADDING CONNECTS BETWEEN TASKS

When adding connects between tasks in Table View, use task ID number and connect type abbreviations. Entering a “1 SS” value in “Successors” field of task, will add a “Start-to-Start” connect between chosen task anf task with “1” ID number.


• NEW EDITING ELEMENTS

No more additional actions needed to edit tasks directly on Gantt chart. Simply choose the task and all editing elements will be available at once: drag the task to change its date, pull the edge to change duration and drag the connection arrow to add connects between tasks.


• COMPLETION PERCENT CHANGING

For quick editing of completion percent, choose the task, press “Option” button and drag the cursor to set the value.


• GANTT CHART ZOOM

Scroll in the screen or use keyboard shortcut to scale Gantt chart view, instead of using “+“ and “-“ buttons .


• HTML REPORTS

There is Task Report Compact and Task Report Extended added.


• AND MUCH MORE

Go to our website to learn more: https://www.dk-consulting.app/project-office